Electrician Telford JDR Electrical

Electrician Telford JDR Electrical Electrician In Telford, Part P Registered, Providing Electrical, PAT Testing, LED Lighting, Emergency Lighting, Fire & CO Detection Systems.

Work Beginning On The Installation Of New Electrical Supply & Circuits For Our Clients 2nd Blast Chiller πŸ‘·πŸ»β€β™‚οΈβš‘οΈ
28/05/2026

Work Beginning On The Installation Of New Electrical Supply & Circuits For Our Clients 2nd Blast Chiller
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Installed New Decorative Light Fitting Central Over Customers StaircaseπŸ‘·πŸ»β€β™‚οΈβš‘οΈ
22/05/2026

Installed New Decorative Light Fitting Central Over Customers Staircase
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Repositioned Circuit Cabling For The Landing Light To Central Over The Staircase & Installed New Decorative Light Fittin...
22/05/2026

Repositioned Circuit Cabling For The Landing Light To Central Over The Staircase & Installed New Decorative Light Fitting
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Lighting Upgrade From Fluorescent To LED At Our Clients Activity CentreπŸ‘·πŸ»β€β™‚οΈβš‘οΈ
20/05/2026

Lighting Upgrade From Fluorescent To LED At Our Clients Activity Centre
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Lighting Upgrade From Fluorescent To LED At Our Clients Activity Centre 5ft Fluorescent Fittings Replaced For NEW 5ft LE...
20/05/2026

Lighting Upgrade From Fluorescent To LED At Our Clients Activity Centre
5ft Fluorescent Fittings Replaced For NEW 5ft LED Batten fittings
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Upgraded The Standard 5metre Tethered Charger Cable For New Longer 10metre Cable For Our Customers Hypervolt Home Pro 32...
01/05/2026

Upgraded The Standard 5metre Tethered Charger Cable For New Longer 10metre Cable For Our Customers Hypervolt Home Pro 32A 7KW EV Charge Point πŸ”ŒπŸš˜
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Lighting Upgrade From Fluorescent To LED At Our Clients Activity Centre 1x 6ft Fluorescent Fitting Replaced For 1x NEW 6...
30/04/2026

Lighting Upgrade From Fluorescent To LED At Our Clients Activity Centre
1x 6ft Fluorescent Fitting Replaced For 1x NEW 6ft LED Batten fitting Within The Toilet
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Lighting Upgrade From Fluorescent To LED At Our Clients Activity Centre 2x 6ft Fluorescent Fittings Replaced For 2x NEW ...
30/04/2026

Lighting Upgrade From Fluorescent To LED At Our Clients Activity Centre
2x 6ft Fluorescent Fittings Replaced For 2x NEW 6ft LED Batten fittings
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ

Drilled The Required Cable Access Holes Through The Partition Walls & Installed New TPN Distribution Board In Position F...
15/04/2026

Drilled The Required Cable Access Holes Through The Partition Walls & Installed New TPN Distribution Board In Position For Our Clients New Extension.
πŸ‘·πŸ»β€β™‚οΈβš‘οΈ Hager

Address

Madeley
Telford
TF7

Alerts

Be the first to know and let us send you an email when Electrician Telford JDR Electrical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Electrician Telford JDR Electrical:

Share