22/01/2025
After many weeks on this job it has finally all been completed. Two great customers to work for🤝
Hopefully now they can enjoy this massive space for when the weather turns👍
Recap on job:
• Rip out and removal of all old deck.
• Framework all cut and made to size.
• Over 80sqm of Composite decking laid with composite shiplap to finish sides.
• Two purpose built steps top and bottom of decking.
• And finally 20m plus of balustrade.
Appreciate as always if my friends, family and customers could leave a like and share.
If you are looking for any type of work we do please drop us a message. Thanks all