21/05/2026
Another bathroom ticked off for a lovely customer in Widnes
The main aim of the bathroom refurb was for the bath to go and be replaced with a shower tray for easy access. It was thought that the tray would have to go on legs but was able to get the tray in the floor so it’s as low as possible.
The bathroom was stripped back to brick and started all over again. A new Upvc ceiling was fitted rather than a plastered ceiling. LVT flooring fitted rather than tiles on the floor.