22/02/2026
This one started with old tiles incorrectly bonded straight onto floor boards β plenty of adhesive and a lot of clean-up required.
We:
π¨ Removed tiles and debris
π§Ή Cleared back all adhesive
π Checked and prepped the existing boards
πͺ΅ Installed plywood overboarding for strength and stability
Now itβs perfectly prepped and ready for the new vinyl.
The difference between a floor that lasts 2 years and one that lasts 20?
Preparation β
Work carried out alongside Joe crean carpets & flooring