07/08/2026
One working week in, with one rolled digger, and we’ve completed most of the demolition while getting both buildings up to DPC level. 💪
We’ve decided to leave the final section of the demolition and floor breakout until after we’ve built the walls and installed the roof on the extension.
This means our clients can keep using their kitchen and bathroom for as long as possible, with only a short period of disruption when it’s time to swap everything over. 👌
If you, or someone you know, is planning an extension, renovation, or any other building project, get in touch for a free, no-obligation quotation.
Better Call Saul 🔨