16/06/2024
Full bathroom renovation :
- stripped all the old tiles and all the bathroom fittings
- applied the water resistant membrane
- build box for the Build- in toilet
- flor tiles + wall tiles
- custom unit for the sink
- fitting the toilet , sink , bath and radiator
- ceiling repair and paint
- painting the door
- installing bath screen
- window board + window privacy film
- grouting + siliconing
- installing ventilation
- mirror ,towel holder + paper holder