GDB Construction

GDB Construction Registered and fully insured company. Based in Co. Carlow. Building/Renovation and Landscaping is o

Some airtightness and internal stud work done on a new build in wexford last week.
30/06/2026

Some airtightness and internal stud work done on a new build in wexford last week.

A lovely porcelain patio all finished and ready for the summer. All the groundwork, drainage, tiles and sleepers were in...
19/06/2026

A lovely porcelain patio all finished and ready for the summer.
All the groundwork, drainage, tiles and sleepers were installed by us to leave this stunning finish 👌

Another one done ✔️ There was a nice bit of demolition and Construction work in this before any tiling  could start. We ...
04/03/2026

Another one done ✔️

There was a nice bit of demolition and Construction work in this before any tiling could start.

We stripped out the old bathroom and knocked a few walls of an adjoining cloakroom to make the bathroom bigger.

We fit in a bath and shower tray with not even an inch to spare.

The room was also fully replumbed, floors leveled, walls slabbed and tanked before tiling started.

Something a little different this time.An ensuite bathroom on the first floor was completely stripped out and turned int...
01/03/2026

Something a little different this time.

An ensuite bathroom on the first floor was completely stripped out and turned into a wet room.

A sloped floor was created with a jackoboard tray.

Fully tanked all walls and floor.

Tiled the room completely

Done a pvc cieling

Fit a new electric triton shower and vertical radiator. 👌

An ensuite bathroom fully redone with concrete grey SPC cladding and a white pvc cieling. New shower, toilet, sink, radi...
04/02/2026

An ensuite bathroom fully redone with concrete grey SPC cladding and a white pvc cieling.

New shower, toilet, sink, radiator and all accessories fitted also.

Some of the smaller jobs done in 2025Concrete workTimber flooring Splashbacks tiledPergolas built.
01/01/2026

Some of the smaller jobs done in 2025

Concrete work
Timber flooring
Splashbacks tiled
Pergolas built.

Another bathroom done in 2025
01/01/2026

Another bathroom done in 2025

Another bathroom wrapped up.Walls done with spc panels Floor done with matching lvt New shower, tray and door fitted New...
22/12/2025

Another bathroom wrapped up.

Walls done with spc panels
Floor done with matching lvt
New shower, tray and door fitted
New radiator fitted
Shower area waterproofed

Address

Tullow

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 7am - 4pm
Saturday 9am - 2pm

Website

Alerts

Be the first to know and let us send you an email when GDB Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to GDB Construction:

Shortcuts

Share