04/03/2026
Another one done βοΈ
There was a nice bit of demolition and Construction work in this before any tiling could start.
We stripped out the old bathroom and knocked a few walls of an adjoining cloakroom to make the bathroom bigger.
We fit in a bath and shower tray with not even an inch to spare.
The room was also fully replumbed, floors leveled, walls slabbed and tanked before tiling started.