This has been in the pipeline for a while,but it's time to go 😀😀😀😀🧱🧱👍👍👌👌
Few more footings to dig and pour then it's firstly into the blockwork.
120m² of the 20 series blocks- retaining walls and footings.
150m² of the 25 series blocks- retaining walls and swimming pool
Then 150m² of bagged brickwork with a brick slip outdoor fire place.