under constructionLAKE HOUSEWith the final few structural steel frames and beams being installed, the coming weeks will ...
30/05/2026

under construction
LAKE HOUSE

With the final few structural steel frames and beams being installed, the coming weeks will see the er****on of the pre-manufactured timber frames.

UNDER CONSTRUCTION Craighead Diocesan - West Watson Block - Stage 1Work in the West Watson Block at Craighead Diocesan S...
28/05/2026

UNDER CONSTRUCTION
Craighead Diocesan - West Watson Block - Stage 1

Work in the West Watson Block at Craighead Diocesan School has moved to the exterior to start forming the new Portico Entry.

under constructionLAKE HOUSEA pre‑manufacture meeting was held on the 8th May with the contractor and manufacturer. All ...
26/05/2026

under construction
LAKE HOUSE

A pre‑manufacture meeting was held on the 8th May with the contractor and manufacturer. All the frames were reviewed in detail before fabrication begun. A bit of planning now minimizes the need to reform frames on‑site.

The first frames are due on site later this week.

UNDER CONSTRUCTION Craighead Diocesan - West Watson Block - Stage 1The last of the new timber partition framing for the ...
07/05/2026

UNDER CONSTRUCTION
Craighead Diocesan - West Watson Block - Stage 1

The last of the new timber partition framing for the renovation of the Administration area in the West Watson Block at Craighead Diocesan School are being fitted

Back-of-wall services such as power, data, air-handling and plumbing are currently being installed in readiness for internal linings.

UNDER CONSTRUCTIONrenovation The design brief for this renovation was to open-up the living and kitchen spaces to the su...
03/05/2026

UNDER CONSTRUCTION
renovation

The design brief for this renovation was to open-up the living and kitchen spaces to the sun and maximize the views to the Lake and the Remarkable Range.

With the work on the roof windows well underway the views to the Remarkables are being realised.

under constructionLAKE HOUSEThis morning’s project construction meeting held online saw the builder in their site office...
01/05/2026

under construction
LAKE HOUSE

This morning’s project construction meeting held online saw the builder in their site office, the architect in their studio, and the client joining from their home in Australia — each watching the Lake House construction unfold live on the we**am as we talked through the next steps.

Modern collaboration at its best with technology keeping everyone connected and the vision moving forward.

UNDER CONSTRUCTION Craighead Diocesan - West Watson Block - Stage 1The renovation of the Administration area in the West...
30/04/2026

UNDER CONSTRUCTION
Craighead Diocesan - West Watson Block - Stage 1

The renovation of the Administration area in the West Watson Block at Craighead Diocesan School is nearly ready for internal linings.

Structural steel bracing frames, beams and posts have beam fabricated and installed along with new timber partition framing.

Back-of-wall services such as power, data, air-handling and plumbing are currently being installed.

UNDER CONSTRUCTIONTimaru South School - Reception and Accessible facilities RefurbishmentConstruction work at Timaru Sou...
28/04/2026

UNDER CONSTRUCTION
Timaru South School - Reception and Accessible facilities Refurbishment

Construction work at Timaru South School moves to the refurbishment of the Reception and Accessible facilities.

Interior demolition and new partition framing is complete and work on the entry canopy will soon commence.

UNDER CONSTRUCTIONRestoration of the Historic Arowhenua Māori School Building - TarahaoaA recent Courier article on the ...
16/04/2026

UNDER CONSTRUCTION
Restoration of the Historic Arowhenua Māori School Building - Tarahaoa

A recent Courier article on the restoration.
Rushton Architect are the Heritage Architect commissioned for the project.

A project to restore a historically significant 131-year old South Canterbury taonga is under way. Arowhenua Māori School’s original building, Tarahaoa, was built in 1895 and is the only surviving and still in use original native school building in the South Island. It was built on a single acre ...

under constructionLAKE HOUSEWith the floor slab poured, the focus has turned to erecting and bracing the steel frames.  ...
15/04/2026

under construction
LAKE HOUSE

With the floor slab poured, the focus has turned to erecting and bracing the steel frames.

Address

2 Sefton Street East
Timaru
7910

Opening Hours

Monday 8:30am - 5:30pm
Tuesday 8:30am - 5:30pm
Wednesday 8:30am - 5:30pm
Thursday 8:30am - 5:30pm
Friday 8:30am - 5:30pm

Telephone

+6436848908

Alerts

Be the first to know and let us send you an email when RUSHTON ARCHITECTS posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share