12/02/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—ฅ๐—ผ๐—ผ๐—ณ ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—œ ๐Ÿ‚

1. Front setback
- Front setback area temporarily used for material storage.

2. Roofing truss materials
- Steel truss components prepared for roof installation.

3. Steel layout work
- Worker measuring and positioning steel framing components.

4. Truss installation in progress
- Two workers installing roofing truss members.

5. Beam and roof framing in progress
- Steel members placed above concrete walls.

6. Roof framing in progress
- A concrete house under construction with roof framing currently in progress.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—ฉ๐—œ ๐ŸŒฑ1. Electrical rough-in- Wall wiring for above counter outlets in...
10/02/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—ฉ๐—œ ๐ŸŒฑ

1. Electrical rough-in
- Wall wiring for above counter outlets installed and ready for finishing.

2. Outlet sample
- Sample duplex convenience outlet placement for reference.

3. Light switches installed
- Switches mounted on a finished concrete wall.

4. Cleared setback area
- Setback cleared after removal of temporary scaffolding.

5. Concrete staircase
- Newly cast stairs connecting lower and upper levels.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—ฉ ๐ŸŒฟ1. Living Area โ€“ Interior Works- The main living area with ongoin...
27/01/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—ฉ ๐ŸŒฟ

1. Living Area โ€“ Interior Works
- The main living area with ongoing wall plastering and preparations for electrical and finishing works.

2. Kitchen and Dining Area โ€“ Interior Works
- Kitchen and dining space under construction, with plastered walls and layout preparations for future fixtures.

3. Staircase with Under-Stair Storage
- Staircase area showing the integrated storage space beneath, with structural and finishing works in progress.

4. Under-Stair Storage Flooring
- Newly poured concrete flooring for the storage area located beneath the staircase.

5. Toilet & Bath and walk-in closet Interior
- Toilet and bath area under construction, with plumbing provisions and surface finishing underway.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—œ๐—ฉ ๐ŸŒฑ1. Interior Wall Foundation Works- Excavation and CHB laying for...
22/01/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—œ๐—ฉ ๐ŸŒฑ

1. Interior Wall Foundation Works
- Excavation and CHB laying for interior walls, ensuring proper alignment and support.

2. Staircase Construction
- Concrete stairs completed with soil preparation below for the stair landing and adjacent spaces.

3. Interior Room Formation
- Enclosed room with plastered walls, showing the defined layout of interior spaces.

4. Stairwell View
- Top-down view of the concrete staircase, highlighting structural alignment and circulation flow.

5. Site Preparation and Cleanup
- Workers organize and clear materials around the site to maintain a safe and efficient construction area.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—œ๐—œ๐—œ ๐ŸŒฟ1. Building Exterior Progress- The main structure is taking shap...
20/01/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ

๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—ฎ๐—ฟ๐˜ ๐—œ๐—œ๐—œ ๐ŸŒฟ

1. Building Exterior Progress
- The main structure is taking shape, showing completed concrete works for both ground and second floors.

2. Wall Finishing Works
- Plastering and surface preparation at wall openings to achieve a smooth and uniform finish.

3. Toilet and Bath Interior Works
- Plastered walls inside the toilet and bath area, marking progress in defining wet spaces and preparing surfaces for finishes.

4. Wall Plastering for Glass Opening
- Ongoing wall plastering works with structural preparation for a wide glass door and window opening, ensuring proper alignment and finish for future installation.

5. Electrical Rough-Ins
- Installation of the electrical panel and conduit lines, preparing the house for power distribution.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—”๐—ฅ๐—ง ๐—œ๐—œ1. Ongoing Interior Works- Active interior construction with floor...
15/01/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—–๐—ผ๐—ป๐˜€๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐—จ๐—ฝ๐—ฑ๐—ฎ๐˜๐—ฒ ๐—ฃ๐—”๐—ฅ๐—ง ๐—œ๐—œ

1. Ongoing Interior Works
- Active interior construction with floor preparation and plastering, moving closer to space completion.

2. Second Floor Interior Wall Sections
- Masonry and plastering works completed on selected interior walls, showing defined room layouts.

3. Structural Slab and Beam Works
- Interior view highlighting the completed concrete beams and slab, with provisions in place for electrical and utility installations.

4. Rear Exterior structural progress
- Overall exterior rear view showing the building structure with temporary scaffolding, supporting ongoing construction and finishing works.

5. Overall Structural Progress
- A wide view of the house structure, showing significant progress on both ground and second-floor levels.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๐˜พ๐™ค๐™ฃ๐™จ๐™ฉ๐™ง๐™ช๐™˜๐™ฉ๐™ž๐™ค๐™ฃ ๐™‹๐™ง๐™ค๐™œ๐™ง๐™š๐™จ๐™จ ๐™๐™ฅ๐™™๐™–๐™ฉ๐™š ๐™‹๐˜ผ๐™๐™ ๐™„ | ๐™Ž ๐™๐™š๐™จ๐™ž๐™™๐™š๐™ฃ๐™˜๐™š1. Interior Wall Openings- Wall openings are formed an...
13/01/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ

๐˜พ๐™ค๐™ฃ๐™จ๐™ฉ๐™ง๐™ช๐™˜๐™ฉ๐™ž๐™ค๐™ฃ ๐™‹๐™ง๐™ค๐™œ๐™ง๐™š๐™จ๐™จ ๐™๐™ฅ๐™™๐™–๐™ฉ๐™š ๐™‹๐˜ผ๐™๐™ ๐™„ | ๐™Ž ๐™๐™š๐™จ๐™ž๐™™๐™š๐™ฃ๐™˜๐™š

1. Interior Wall Openings
- Wall openings are formed and prepared, defining windows, doorways and access points for interior spaces.

2. Stair Access Preparation
- Ongoing work along the stairwell, ensuring proper alignment and surface preparation for safe access.

3. Staircase Structural Works
- Scaffolding and formworks are installed for the construction of the reinforced concrete staircase.

4. Interior Plastering Works
- Interior wall surfaces are being plastered, refining finishes and preparing for the next construction phase.

5. Exterior Wall Finishing
- Exterior walls are plastered and shaped, giving form to the buildingโ€™s faรงade.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐—ฆ๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น, ๐— ๐—ฎ๐˜€๐—ผ๐—ป๐—ฟ๐˜†, ๐—ฎ๐—ป๐—ฑ ๐—œ๐—ป๐˜๐—ฒ๐—ฟ๐—ถ๐—ผ๐—ฟ ๐—ช๐—ผ๐—ฟ๐—ธ๐˜€ ๐—ถ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐ŸŒฑโœจ1. Exterior Structure and Second-Floor Works- On...
08/01/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—ฆ๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น, ๐— ๐—ฎ๐˜€๐—ผ๐—ป๐—ฟ๐˜†, ๐—ฎ๐—ป๐—ฑ ๐—œ๐—ป๐˜๐—ฒ๐—ฟ๐—ถ๐—ผ๐—ฟ ๐—ช๐—ผ๐—ฟ๐—ธ๐˜€ ๐—ถ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐ŸŒฑโœจ

1. Exterior Structure and Second-Floor Works
- Ongoing construction of the main structure, with second-floor walls and openings already formed and finishing works underway.

2. Interior Ground Preparation
- Interior spaces are being cleared, leveled, and prepared for floor works and utility installations.

3. Floor Screeding in Progress
- Fresh concrete screed is being applied to level the floor surface and achieve proper floor elevation.

4. Material Staging and Interior Preparation
- Construction materials are organized inside the structure, ready for continued masonry and finishing works.

5. Staircase Construction Detail
- The staircase structure is in place, showing completed steps as preparations continue for finishing works.

6. interior Wall Finishing and Work Platform Setup
- Interior wall works continue with temporary platforms in place to support plastering and finishing activities.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐— ๐—ฎ๐˜€๐—ผ๐—ป๐—ฟ๐˜† ๐—ฎ๐—ป๐—ฑ ๐—ฃ๐—น๐—ฎ๐˜€๐˜๐—ฒ๐—ฟ๐—ถ๐—ป๐—ด ๐—ช๐—ผ๐—ฟ๐—ธ๐˜€ ๐—ถ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐Ÿ“๐ŸŒฟ1. Second-Floor Wall Construction in Progress- Concrete hol...
06/01/2026

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐— ๐—ฎ๐˜€๐—ผ๐—ป๐—ฟ๐˜† ๐—ฎ๐—ป๐—ฑ ๐—ฃ๐—น๐—ฎ๐˜€๐˜๐—ฒ๐—ฟ๐—ถ๐—ป๐—ด ๐—ช๐—ผ๐—ฟ๐—ธ๐˜€ ๐—ถ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐Ÿ“๐ŸŒฟ

1. Second-Floor Wall Construction in Progress
- Concrete hollow block walls are being laid on the second floor, supported by wooden scaffolding to ensure proper alignment and safe access during masonry work.

2. Interior Wall Construction
- Interior CHB walls are being constructed around existing columns and beams, defining the room layout and reinforcing the buildingโ€™s structural framework.

3. Ongoing Plastering of Second-Floor Walls
- Workers are applying plaster to the second-floor walls, smoothing and finishing the surface in preparation for final wall treatments.

4. Masonry Works With Tarp Shading
- Ongoing masonry activities are protected by temporary shading, allowing continuous work while shielding materials and workers from direct sunlight.

5. Interior CHB Wall Piling
- Concrete hollow blocks are being laid to form interior walls on the second-floor level, shaping internal spaces and room divisions.

6. Overall Structural Progress
- The structure is shown with extensive scaffolding in place, indicating continued work on second-floor walls and remaining structural elements.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

05/01/2026

A Prosperous New Year to all! ๐ŸŽ‰

Every structure starts with a vision. ๐Ÿ“
Hereโ€™s a look back at our 2025 construction progress for the S Residence โ€” where design meets dedication ๐Ÿคฉ๐Ÿซถ๐Ÿผ

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐—ฆ๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น, ๐—˜๐—น๐—ฒ๐—ฐ๐˜๐—ฟ๐—ถ๐—ฐ๐—ฎ๐—น, ๐—ฎ๐—ป๐—ฑ ๐—œ๐—ป๐˜๐—ฒ๐—ฟ๐—ถ๐—ผ๐—ฟ ๐——๐—ฒ๐˜ƒ๐—ฒ๐—น๐—ผ๐—ฝ๐—บ๐—ฒ๐—ป๐˜ ๐—ถ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ โŒ›๏ธ๐Ÿ› 1. Exterior Structure Nearing Completi...
16/12/2025

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—ฆ๐˜๐—ฟ๐˜‚๐—ฐ๐˜๐˜‚๐—ฟ๐—ฎ๐—น, ๐—˜๐—น๐—ฒ๐—ฐ๐˜๐—ฟ๐—ถ๐—ฐ๐—ฎ๐—น, ๐—ฎ๐—ป๐—ฑ ๐—œ๐—ป๐˜๐—ฒ๐—ฟ๐—ถ๐—ผ๐—ฟ ๐——๐—ฒ๐˜ƒ๐—ฒ๐—น๐—ผ๐—ฝ๐—บ๐—ฒ๐—ป๐˜ ๐—ถ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ โŒ›๏ธ๐Ÿ› 

1. Exterior Structure Nearing Completion
- The buildingโ€™s exterior walls and upper level are already formed, with protective tarpaulins installed around the site as finishing and interior works continue.

2. Welding of Stair Supports
- A worker is welding steel supports in the designated stair area. These reinforcements will serve as the structural support for the staircase before concrete pouring and finishing works begin.

3. Interior Ground Excavation and Preparation
- The ground inside the structure is being excavated and leveled in preparation for utilities installation and proper floor line alignment.

4. Electrical Rough-In Installation
- Electrical conduits and wiring are being laid out inside the walls, preparing the structure for future electrical fixtures and connections.

5. Staircase Reinforcement Setup
- A worker is assembling steel reinforcements for the staircase, ensuring proper support and strength before concrete pouring.

6. Ongoing Interior Works and Material Staging
- The photo shows active interior construction, with materials staged on-site while workers continue masonry, plastering, and ground preparation tasks.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ๐—ฃ๐—น๐—ฎ๐˜€๐˜๐—ฒ๐—ฟ๐—ถ๐—ป๐—ด ๐—ช๐—ผ๐—ฟ๐—ธ๐˜€ ๐—ฎ๐—ป๐—ฑ ๐—ฆ๐—ถ๐˜๐—ฒ ๐—ฃ๐—ฟ๐—ฒ๐—ฝ๐—ฎ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐ŸŒฑ1. Sand Screening for Mortar- Workers have screened fi...
04/12/2025

๐™‹๐™๐™Š๐™‚๐™๐™€๐™Ž๐™Ž ๐˜พ๐™ƒ๐™€๐˜พ๐™† โ€ผ๏ธ๏ธ

๐—ฃ๐—น๐—ฎ๐˜€๐˜๐—ฒ๐—ฟ๐—ถ๐—ป๐—ด ๐—ช๐—ผ๐—ฟ๐—ธ๐˜€ ๐—ฎ๐—ป๐—ฑ ๐—ฆ๐—ถ๐˜๐—ฒ ๐—ฃ๐—ฟ๐—ฒ๐—ฝ๐—ฎ๐—ฟ๐—ฎ๐˜๐—ถ๐—ผ๐—ป ๐—ฃ๐—ฟ๐—ผ๐—ด๐—ฟ๐—ฒ๐˜€๐˜€ ๐ŸŒฑ

1. Sand Screening for Mortar
- Workers have screened fine sand to ensure the right consistency and cleanliness before mixing it with cement for plastering and masonry works.

2. Mixing Cement for Plastering
- Workers manually mixing cement, sand, and water on the ground to create plastering mortar. The mixture appears wetter and is being prepared for wall finishing, not for structural concrete.

3. Preparing Mortar for Wall Plaster
- The worker is blending and adjusting the consistency of the mortar mix. This mix will be used for plastering the walls.

4. Wall Plastering
- Workers are applying plaster on the upper wall area to achieve a smooth and even surface before final finishing.

5. Detailed Wall Plaster Finishing
- The worker is carefully plastering the wall, refining the surface texture for a consistent and clean finish.

6. Interior Piling and Structural Works
- The photo shows ongoing interior structural work, including masonry walls and scaffolding setup for higher-level access.

For your design needs, message us:
๐Ÿ“ฉ [email protected]
๐Ÿ“ž 09322007076 - DITO
๐Ÿ“ž 09177064041 - Globe

Address

Garcia Heights, Bajada
Davao City
8000

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm
Saturday 9am - 6pm

Website

Alerts

Be the first to know and let us send you an email when AnKh Design Studio posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share