๐๐ซ๐จ๐ ๐ซ๐๐ฌ๐ฌ ๐๐๐ฉ๐จ๐ซ๐ญ: ๐๐ญ๐ซ๐ฎ๐๐ญ๐ฎ๐ซ๐๐ฅ ๐๐ญ๐๐๐ฅ ๐๐ง๐ ๐๐๐ฌ๐จ๐ง๐ซ๐ฒ ๐๐จ๐ซ๐ค๐ฌ
๐๐ซ๐จ๐ฃ๐๐๐ญ: ๐๐๐ฌ๐ค๐๐ญ๐๐๐ฅ๐ฅ ๐๐จ๐ฏ๐๐ซ๐๐ ๐๐จ๐ฎ๐ซ๐ญ
๐๐จ๐ง๐ญ๐ซ๐๐๐ญ๐จ๐ซ: ๐&๐ ๐๐๐ฌ๐ข๐ ๐ง+๐๐ฎ๐ข๐ฅ๐
๐๐จ๐๐๐ญ๐ข๐จ๐ง: ๐
๐ฎ๐๐ง๐ญ๐๐ฌ ๐๐., ๐๐ซ๐ ๐ฒ. ๐๐๐ฃ๐๐, ๐๐๐ฉ๐ฎ-๐ฅ๐๐ฉ๐ฎ ๐๐ข๐ญ๐ฒ, ๐๐๐๐ฎ
๐๐๐๐๐๐๐๐๐๐๐๐ ๐๐๐๐๐
โข ๐บ๐๐๐๐๐๐๐๐๐ ๐บ๐๐๐๐ ๐ญ๐๐๐๐๐๐ & ๐น๐๐๐๐๐๐: Focused on the advancement of structural steel framing and canopy roof installation.
โข ๐ช๐๐๐๐๐๐๐๐ ๐ฐ๐๐๐๐๐๐๐๐๐๐๐: Steadily progressed with the installation of purlins, C-channel framing, flat bars, and steel matting assemblies across multiple elevations and roof sections.
โข ๐พ๐๐๐
๐๐๐ & ๐ฐ๐๐๐๐๐๐๐๐๐๐: Systematically carried out full welding of structural connections to ensure the permanent integration of C-channels, tubular members, and steel matting.
โข ๐ญ๐๐๐๐๐๐๐๐๐๐: Conducted the fabrication of steel members in parallel to support ongoing installations.
โข ๐ด๐๐๐๐๐๐ ๐พ๐๐๐๐: Continued with CHB wall installation.
โข ๐ฝ๐๐๐๐๐๐๐๐๐๐ ๐ฐ๐๐๐๐๐๐๐๐๐๐: Advanced the installation of steel matting at short rafters for stack ventilation as part of the system integration.
โข ๐ญ๐๐๐๐๐๐๐๐ & ๐ท๐๐๐๐๐๐๐๐๐: Simultaneously undertook painting and finishing works to provide corrosion protection and prepare sections for inspection.
โข ๐ธ๐๐๐๐๐๐ ๐ช๐๐๐๐๐๐: Maintained alignment with approved plans and engineering standards through coordinated sequencing of all activities.