Roman Interior Works

Roman Interior Works From painting and decorating, tiling, finishing, carpentry, even simple jobs like putting up shelves

First project after summer holidays. Fitting in new double glazed windows. Had to reduce the existing opening to fit the...
18/09/2023

First project after summer holidays. Fitting in new double glazed windows. Had to reduce the existing opening to fit the size of the new windows first.

Plasterboarding is done! Next job is to lay new floor tiles, then we're ready to install complete new kitchen
26/06/2023

Plasterboarding is done! Next job is to lay new floor tiles, then we're ready to install complete new kitchen

How to cut a complex shape to fit the fireplace? I like to use cardboard templates, free material, easy to work with
05/05/2023

How to cut a complex shape to fit the fireplace? I like to use cardboard templates, free material, easy to work with

Insulating brick walls with 5 cm thick panels, followed by stud wall frame to support plasterboard. This space will soon...
05/05/2023

Insulating brick walls with 5 cm thick panels, followed by stud wall frame to support plasterboard. This space will soon become a new kitchen

New tiled floor
05/05/2023

New tiled floor

Leaky roof repair. Cleaned the surface fist with pressure washer, followed by one coat of bitumen based primer, then the...
05/05/2023

Leaky roof repair. Cleaned the surface fist with pressure washer, followed by one coat of bitumen based primer, then the roofing felt. Cheapest and most efficient solution for flat roof

Mezzanine is up. It'll still need some finishing touches
23/02/2023

Mezzanine is up. It'll still need some finishing touches

From this...
31/01/2023

From this...

To this....   Little while ago, I have started a complete renovation of this room, in the old, traditional stone wall ho...
31/01/2023

To this.... Little while ago, I have started a complete renovation of this room, in the old, traditional stone wall house in Central Portugal. First of all, I removed the false ceiling, checked the rafters and main beam, added waterproof membrane and installed 5cm thick insulation panels, followed by new plaster board ceiling, with 3 overhead lights. All the walls were rendered with Reboco, painted with 1 coat of primer, and 2 coats of paint. Next was the new concrete floor, which is ready for tiling this week. Then I'll install a mezzanine and the wood stove. Final job will be the last coat of paint to get nice, clean finish. More pictures to follow

Starting to build a mezzanine today. Two main beams, which will support the whole structure will span 3.7 meters. For th...
31/01/2023

Starting to build a mezzanine today. Two main beams, which will support the whole structure will span 3.7 meters. For this I will use kiln dry nordic pine, 22x11cm, strong enough for the job

Most recent job, pine floor boards, sanded with belt sander, random orbital sander, followed by 3 coats of varnish. Sati...
22/12/2022

Most recent job, pine floor boards, sanded with belt sander, random orbital sander, followed by 3 coats of varnish. Satisfied customer

Endereço

Rua Nossa Senhora Da Conceicao 76
Alvaiázere
3250-149

Telefone

+351911123981

Website

Notificações

Seja o primeiro a receber as novidades e deixe-nos enviar-lhe um email quando Roman Interior Works publica notícias e promoções. O seu endereço de email não será utilizado para qualquer outro propósito, e pode cancelar a subscrição a qualquer momento.

Entre Em Contato Com O Negócio

Envie uma mensagem para Roman Interior Works:

Compartilhar