An extremely busy week for the team, across the wet and windy Algarve! Responding to flood warnings and wind damage aswel as our current projects, well done lads.
Mosquiera project is now in the final phase, outdoor BBQ and outdoor kitchen, new fully tiled blockwork and plinth, with water drainage and electrics, next week for plumbing and lights install.
New fence and waterproofed wall with natural stone tiles, hydro grouted, wardrobe packs and bedroom being assembled with new AC and light fan.
Albufeira site, new drywall install for slide away invisible doors, door boarded up and insulated, new AC locations, electrics throughout and internet access, floating glass fire install, tiling and painting.
Emergency flood defence to Albufeira Old town, Yolo Lounge bistro and lounge club, prone to flooding, our defences held for the big storm which demolished roofs and trees, we had to fix one rooftop panel the next day was all.