06/11/2025
Day 4️⃣ of the Bathroom Remodel 🔨
✅ All Sheetrock demo is complete and ready for HardieBacker installation.
✅ Prepping the shower area for proper concrete slope to ensure water drains perfectly—this will be a handicap-accessible shower with a linear drain for easy access and safety.
✅ Next steps: install rebar and pour concrete with the correct slope to the drain.
✅ All ceramic flooring has been demoed in the bedroom.
✅ Drywall crack repairs are complete and ready for finish.
We’re making great progress — stay tuned for the next update! 💪✨
Watch, follow, and discover more trending content.