11/11/2026
Another room knocked off the list!
This back mudroom has come a long way! We took this room down to the studs and gave it a complete refresh from top to bottom.
Here’s what went into this transformation:
✅ Removed all existing wood paneling down to the studs
✅ Tore out the old carpet to prepare for new vinyl plank flooring
✅ Insulated the half-bath walls for added sound reduction
✅ Installed new drywall throughout
✅ Removed the textured ceiling and skim-coated for a smooth finish
✅ Painted all ceilings and walls
✅ Painted the interior doors and installed new door casing
✅ Trimmed out the opening leading into the mudroom
✅ Gave the back exterior door a fresh coat of paint in an awesome blue to tie in with other rooms throughout the house!
The next step will be tackling the half bath and laundry room. Once those are finished and everything is ready, we’ll be installing new flooring throughout the entire first floor to bring everything together with one consistent look!
One room at a time, we’re getting closer to the finished product!
Swipe to see progress!
JHJ Renovations LLC
Proudly serving Northeast Ohio
📞 440-865-8889