Bourke Landscaping

Bourke Landscaping Full service landscaping and property preservation company.

04/18/2025

So... somebody just stopped at the farmstore at Dirty Girl Farm in Andes at about 9:30 pm.you headed towards Delhi but your phone was on the ground in the parking lot. I have it. You can stop by before 11 tonight or after 9 am Friday to get it.

It's been a while since we've "posted" anything. So here's a few from today.😂
06/19/2024

It's been a while since we've "posted" anything. So here's a few from today.😂

Happy November!Bourke Landscaping, based in Andes N.Y., is offering dump trailer services for construction and demolitio...
11/01/2022

Happy November!

Bourke Landscaping, based in Andes N.Y., is offering dump trailer services for construction and demolition as well as general cleanup needs. 7 foot by 14 foot. 7 cubic yard. 4.5 ton capacity. We drop off the trailer to your house or jobsite and you fill it. We come back and haul it away. You pay trailer fee and $89/ ton dump fee. We also offer demolition and cleanout services. Contact Lester Bourke at Bourke Landscaping for pricing. (845) 701-7979

A little driveway work. Remove old crumbled blacktop, clean ditches. Replace with crushed bluestone, regrade, and compac...
08/10/2022

A little driveway work. Remove old crumbled blacktop, clean ditches. Replace with crushed bluestone, regrade, and compact.

Final photos of the polebarn project. All the trim is done. Doors are finished. Cleaned up the remaining scraps and all ...
07/20/2022

Final photos of the polebarn project. All the trim is done. Doors are finished. Cleaned up the remaining scraps and all the tools are in the truck. It's going to feel odd not making the drive to the job after the last two and a half months but the owners are happy and that's what we love. Time for the next project. 🙂

Weekly polebarn project update. Got the track on and sliding doors built and installed. Trim and battens on the front an...
07/16/2022

Weekly polebarn project update. Got the track on and sliding doors built and installed. Trim and battens on the front and shed side walls. Just have to finish the back wall and battens on the side with windows and the sliding doors.

Polebarn update. Finished the siding. Windows and door are installed started the trim. Next week batten strips and hopef...
07/09/2022

Polebarn update. Finished the siding. Windows and door are installed started the trim. Next week batten strips and hopefully the main door.

Started siding on the pole barn (after finishing the rough openings for the windows). The final piece of ridge cap came ...
07/02/2022

Started siding on the pole barn (after finishing the rough openings for the windows). The final piece of ridge cap came in so finished the roof today and a little final grading to increase the available parking and make the access into the polebarn easier. Enjoy your weekend folks. More pictures next week.

Roof is finally on just waiting for missing ridge cap.  In the meantime picked up the siding today. Tomorrow frame the w...
06/30/2022

Roof is finally on just waiting for missing ridge cap. In the meantime picked up the siding today. Tomorrow frame the window openings and start the board and batten siding.

Weekend project. I wanted to post earlier but not before the customer had seen the finished product.  Just kidding. It's...
06/28/2022

Weekend project. I wanted to post earlier but not before the customer had seen the finished product. Just kidding. It's at our place but since Cyndi Wright and Jesse were away for the weekend I thought I'd surprise them with a new shower.🙂

Some before and after from the lawn mowing side of the Landscaping, Construction and Excavating.
06/18/2022

Some before and after from the lawn mowing side of the Landscaping, Construction and Excavating.

Polebarn project update. Finished getting trusses and rafters and the purlins on. Even managed to start setting some of ...
06/18/2022

Polebarn project update. Finished getting trusses and rafters and the purlins on. Even managed to start setting some of the metal roofing in place. Next week (weather permitting) finish the roof and maybe start siding.

Address

114 Delaware Avenue
Andes, NY
13731

Telephone

+18457017979

Website

Alerts

Be the first to know and let us send you an email when Bourke Landscaping posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share