03/26/2021
Bathroom is coming along nicely. Almost every bit of demo is done. Shower is framed in. Bench seat is almost completely framed in and some of the shelving is framed in. This bathroom is def going to be beautiful when we are done. This is all my own design and floor plan, made from the minds of the homeowners, and I'm almost positive they are both very happy with how it is turning out. Tomorrow I finally get to pour concrete at the cabin. Monday we start laying block at the cabin depending on weather. Can't wait for the block to get done so I can start framing it. Anyway, stay tuned. More to come.