03/04/2026
We have completed the bathroom renovation, taking it down to the studs to address the issue of pipes freezing during winter. To resolve this, a heat run was added, pipes were insulated, and heat tape was applied to all supply lines. The renovation includes Detra heat for heated floors and features a curbless shower with a bench.