05/21/2026
Worked on a pair of bathroom refreshes this week with some pretty awkward floor layouts and tight corners to work around.
Before any flooring went down, I templated both rooms out with builder’s paper and transferred everything onto the sheet vinyl in the garage. Takes a little extra time upfront, but it makes the actual install go much smoother.
Both floors dropped in almost right on the first try with very little trimming afterward.
A lot of finish work in the trades comes down to prep and planning. Slow down in the beginning so you’re not fighting mistakes later.