06/03/2026
West Palm Beach Office Tower Waterproofing & Restoration 🏢💦
Engineering Solutions is pleased to begin a newly contracted structural investigation for a commercial office tower and parking garage located on Palm Beach Lakes Boulevard in West Palm Beach.
This Phase I Waterproofing Assessment will focus on areas where water infiltration has been observed, including the parking garage top deck, building breezeways, and portions of the main building envelope. Our team will review available documentation, perform field observations, and assess key areas such as slab-to-wall interfaces, slab joints, roof and window connections, drain and pipe penetrations, and upper-floor locations where water intrusion may be occurring.
Following the assessment, Engineering Solutions will provide findings and repair recommendations to help the client determine the most appropriate path forward. If requested, Phase II Construction Documents may also be developed to support practical, code-informed repair planning.
Water intrusion issues can quickly impact building performance, safety, and long-term maintenance costs. Our team is proud to support proactive solutions that help protect South Florida properties.