10/16/2026
Another project wrapped up!
This was initially a half bathroom and a closet leading to the laundry room (last 3 pics).
We demoed the tile floors, shelving, and dividing wall.
Then we framed the wet wall and small shelving area before installing the tub and water proofing around the tub.
The toilet and vanity location was moved so we had to patch in some subfloor.
The ceiling needed to be dropped 7 1/2 inches to allow proper ducting for the exhaust fan.
Ceiling joists were notched previously so we had to sister 6 joists to meet code.
We had our plumbing electrical and plastering subbed out (subs will be tagged in comments)
After sheet rock was installed we tiled the shower and laid Schluter ditra uncoupling mat, and tiled the floor.
After the floor was tiled we primed the ceiling and walls, and then painted one coat of finish paint on the ceilings and walls.
After painting we built the built in stand for the washer and drier, installed the trim and painted it 2 coats, and built the shelves behind the shower wet wall.
After all the carpentry we installed the vanity, painted another finish coat on the ceilings and walls, and hung the mirror and other accessories.
774-929-0300 always ready to take on the next project reach out for a free estimate! Registered and insured in RI!