EDM Design and Millwright

EDM Design and Millwright We are a Design Build Contractor devoted to Millwright solutions done right the first time.

Mallard Site is plowing forward!Tower and Legs Set.Bin on its way up.
06/01/2026

Mallard Site is plowing forward!

Tower and Legs Set.

Bin on its way up.

Mallard IA grain site is moving right along. Even with some tough weather.
05/22/2026

Mallard IA grain site is moving right along. Even with some tough weather.

Great Partners make the best of Bad Situations!!! Davis Dirt Works really stepped up when needed, these guys/gals really...
05/16/2026

Great Partners make the best of Bad Situations!!! Davis Dirt Works really stepped up when needed, these guys/gals really know how to play in the mud!!!

Faulkton Feedmill Site Rapidly Changing, Mat Slab poured last friday, Basement walls today!!! Amazing what a week of goo...
05/15/2026

Faulkton Feedmill Site Rapidly Changing, Mat Slab poured last friday, Basement walls today!!! Amazing what a week of good weather does to a jobsite (Besides the 40-50 Mph wind, it has been picture perfect conditions).

Dryer Foundation ✅Tower Foundation ✅Bin Foundation ✅This Grain site will be headed upward soon!
05/13/2026

Dryer Foundation ✅

Tower Foundation ✅

Bin Foundation ✅

This Grain site will be headed upward soon!

Receiving Pit being set in place yesterday and soil reclaim for a Sukup Manufacturing Co. 60-20 Grain Bin underway in Io...
05/05/2026

Receiving Pit being set in place yesterday and soil reclaim for a Sukup Manufacturing Co. 60-20 Grain Bin underway in Iowa!

Busy Monday over here at EDM. Not One but TWO projects begin moving dirt and excavating for foundations. Full stream ahe...
05/05/2026

Busy Monday over here at EDM. Not One but TWO projects begin moving dirt and excavating for foundations. Full stream ahead on construction season!!!

Good luck to all the competing young Althetes this weekend!!! If your in the area stop by and cheer them one!!! Let er B...
05/01/2026

Good luck to all the competing young Althetes this weekend!!! If your in the area stop by and cheer them one!!! Let er Buck!!!

Hopper Cone Replacement, this thing has  handled 900 million bushels of corn. Plus a 200’ long belt conveyor overhaul. A...
04/21/2026

Hopper Cone Replacement, this thing has handled 900 million bushels of corn. Plus a 200’ long belt conveyor overhaul. Awesome job team. Running two shifts to get this project wrapped up in a tight shutdown window. On to the next one!

Sometimes you need to start with Deconstruction in order to Make way for construction!!! Another Proud EDM  Project got ...
04/13/2026

Sometimes you need to start with Deconstruction in order to Make way for construction!!! Another Proud EDM Project got start last week.....any guesses on what it going to be when completed?!?!? A Free Hat to the first correct guesser that message us!!!

Address

209 5th Street NE
Buffalo, MN
55313

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Alerts

Be the first to know and let us send you an email when EDM Design and Millwright posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share