02/28/2024
It's been a while since I've posted as last week I was down with a cold, flu, sinus something. But, I am back at it again. Yesterday I was able to get some work done on the gutters as they are in need of serious attention.
1st issue is the gutter boards are nonexistent for more than half the south side of the house. An old bandaid repair was made when a second layer of shingles were added to repair some of the rotten tongue and groove roof sheathing. The problem is the person used plywood for the repair and never wrapped it in aluminum or put up a drip ledge. So, the roof water was able to soak into it and cause it to buckle, separate, and warp.
I removed the vinyl soffit below, cut out the old plywood, and installed step flashing that tucked under the shingles and overlapped into the gutters. I know, another bandaid fix. But, it will atleast keep the water going into the gutters until we get several consecutive days of dry and warm weather to fix it right.
After this week I will be booked up for the following three weeks with two big projects. The first is a bathroom remodel on the other side of town. This job will entail; new tile floor, new toilet, new vanity, new lighting, new shower doors, new paint color, and a few various bathroom fixtures. Details are still fleshing out for the second project but I will update as they are available.
Hope everyone weathered the storms well. If not let me know if you have any repairs that need done. I can get to them this week before I am locked in for the rest of the month. Have a safe and productive day!