06/18/2026
Bathroom remodel progress update.
10 days into this project and we’ve gone from a builder-grade bathroom to a fully waterproofed curbless shower with continuous porcelain hex flooring and feature wall tile underway.
One thing homeowners rarely get to see is everything that happens behind the finished surfaces:
• Demo to framing
• Plumbing modifications
• Electrical updates
• Waterproofing systems
• Shower preparation
• Tile layout and installation
The finished photos are always exciting, but the quality of a bathroom is determined long before the final fixtures are installed.
Looking forward to sharing the completed transformation in the coming weeks.
Noble Renovations | Design. Build. Improve.