05/28/2026
Ryderwood's phase 2 is complete! And that's a wrap at this location. We installed new windows and trim, faux rock wainscoting, new interior flooring, rebuilt the screened-in patio, replaced rotten siding, and added a fresh coat of exterior paint with SW Dovetail and SW Iron Ore. We've barely had time to breathe, but let's keep rolling!