Holman Building

Holman Building General Contractor, Construction and Property Maintenance
(1)

09/04/2026

Whoooo!

Floating staircase install
09/03/2026

Floating staircase install

Months of planning, measuring, fabrication, and shipping. Our 3 story floating steel staircase is installed. All of the ...
09/03/2026

Months of planning, measuring, fabrication, and shipping.

Our 3 story floating steel staircase is installed.

All of the solid white oak treads are arriving next week.

Excited to show everyone this stunning feat shortly.

Final epoxy coatings, and stain coats being applied today. See everyone next week for the grand Reopening
08/19/2026

Final epoxy coatings, and stain coats being applied today.

See everyone next week for the grand Reopening

08/15/2026

Been busy at a local establishment.

Opening soon!

General Contractor, Construction and Property Maintenance

07/29/2026

Master Bathroom walk through

About 3000 ft.² of heated tile floor being installed on the first floor
07/29/2026

About 3000 ft.² of heated tile floor being installed on the first floor

07/24/2026
Full kitchen gut and remodel. Final stages - refinishing the floors. Big reveal next week.
07/24/2026

Full kitchen gut and remodel. Final stages - refinishing the floors.

Big reveal next week.

48sq ft steam shower, dual shower heads, heated seat bench. Carrera Marble. Custom glass door with transom for venting.
07/24/2026

48sq ft steam shower, dual shower heads, heated seat bench. Carrera Marble. Custom glass door with transom for venting.

Address

105 Dixon Drive
Chestertown, MD
21620

Alerts

Be the first to know and let us send you an email when Holman Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Holman Building:

Shortcuts

Share