RawHyde Construction

RawHyde Construction From remodeling to building new. specializing in tile drywall, framing, flooring, and much more.

Removed the carpet and later some nice pergo flooring
05/29/2026

Removed the carpet and later some nice pergo flooring

Little subway action for this beautiful kitchen.  Before and after
05/06/2026

Little subway action for this beautiful kitchen. Before and after

Finished up another 1,100 sq ft of flooring.
04/18/2026

Finished up another 1,100 sq ft of flooring.

1500 sq ft of Lvp done in 2 days.  My back feels fantastic, and my legs aren’t sore at all.. ;)
03/31/2026

1500 sq ft of Lvp done in 2 days. My back feels fantastic, and my legs aren’t sore at all.. ;)

This old shower pan has a crack in it.  The flex seal tape kept out from leaking but it wasn’t appealing.  I came in and...
03/10/2026

This old shower pan has a crack in it. The flex seal tape kept out from leaking but it wasn’t appealing. I came in and removed the old pan and bottom rows of tile and replaced with a tile shower pan and curb.

This basement room had water damage from the window and the upstairs shower leaking.  Replaced some drywall (hang, tape,...
03/10/2026

This basement room had water damage from the window and the upstairs shower leaking. Replaced some drywall (hang, tape, and texture). New LVP flooring and trim all around.

Large tile in a small bathroom.  Tore out the 50 yr old linoleum and modernized it a bit.  New toilet as well.
03/10/2026

Large tile in a small bathroom. Tore out the 50 yr old linoleum and modernized it a bit. New toilet as well.

This bathroom was a lot of fun.  From concrete walls to fully finished bathroom and custom walk in shower.  I am truly b...
10/21/2025

This bathroom was a lot of fun. From concrete walls to fully finished bathroom and custom walk in shower. I am truly blessed to do what I love for a living. Thank you John and Gale! Here are some before, between, and after pics.

Fun 2 day deck build.  Love the redwood!
09/25/2025

Fun 2 day deck build. Love the redwood!

Framing, insulating, Sheetrock, painting, flooring, trim, and doors.  This was a fun job. Wonderful people to work for a...
09/17/2025

Framing, insulating, Sheetrock, painting, flooring, trim, and doors. This was a fun job. Wonderful people to work for as well. I love being able to do what I love for a living, and the people I get to do work for is always a blessing. I forgot to take pictures before the framing was done but here’s a few before and after.

Address

Cheyenne, WY
82001

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+13073380230

Website

Alerts

Be the first to know and let us send you an email when RawHyde Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category