BlueMaxx Contracting LLC

BlueMaxx Contracting LLC Residential

Shower door
05/14/2022

Shower door

While I'm at it...I finished a bunch of other stuff too...
04/14/2022

While I'm at it...I finished a bunch of other stuff too...

Well... it only took me 2 years... and several changes... and a complete redo in the last month... but I finished my bat...
04/14/2022

Well... it only took me 2 years... and several changes... and a complete redo in the last month... but I finished my bathroom 😆...

So, now I'm on to all the little stuff... grout, molding etc... this light box was an after- thought though... which in ...
01/12/2022

So, now I'm on to all the little stuff... grout, molding etc... this light box was an after- thought though... which in hindsight is the worse kind of idea lol... but I managed to make it work... still has a few more finishing touches to be done.

Once finished with the floor...I could move on to the tile.
01/12/2022

Once finished with the floor...I could move on to the tile.

So... new year and I finally got around to tackling this bathroom floor. Because I'm dealing with a compound slope I had...
01/12/2022

So... new year and I finally got around to tackling this bathroom floor. Because I'm dealing with a compound slope I had to get creative leveling the surface for the Teak shower floor. My final solution was 3/8 hex lag bolts, bolt wedge anchors, pex tubing... and a whole lot of patience. The result was a perfect fit and level x & y.

I finally finished the build in cabinet... roughly 200 hrs, some 500 pieces... and lots of elbow grease... pine and ceda...
12/02/2021

I finally finished the build in cabinet... roughly 200 hrs, some 500 pieces... and lots of elbow grease... pine and cedar with a cognac stain and satin finish.

Basement update: My father was a career military man...25yrs active service. Extremely proud of him for that. So...this ...
11/11/2021

Basement update: My father was a career military man...25yrs active service. Extremely proud of him for that. So...this build is dedicated to him for him. Here we will be able to honor and remember his service...I still have some finish work before staining... but I wanted to share it anyway.

Finally... deck 3 of 3 is finished.
10/08/2021

Finally... deck 3 of 3 is finished.

1 down and 1 to go... all in all not bad for 21hrs.
09/22/2021

1 down and 1 to go... all in all not bad for 21hrs.

A little progress update on the deck...2 days (14 hrs)...tbc on Tuesday...I seriously pride myself on building the safes...
09/18/2021

A little progress update on the deck...2 days (14 hrs)...tbc on Tuesday...I seriously pride myself on building the safest decks possible for clients... absolutely impairative.

09/07/2021

Permits approved... time to build some decks... oh how I miss these days...

Address

Cheyenne, WY
82001

Website

Alerts

Be the first to know and let us send you an email when BlueMaxx Contracting LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to BlueMaxx Contracting LLC:

Share