11/21/2024
The customer was having water drainage issues and wanted a connecting deck to their addition. Dug out 8” of soil in the back and backfilled in with gravel. Sonotube foundation for the new deck. A little rot repair by the old stoop and a nice 14’x30’ platform deck to finish it off.