Creations From The Heart Renovations

Creations From The Heart Renovations Most of my family and friends know that we have been working on renovating our house for quite sometime now.

Its time to get the ball rolling and get this house the way we have imagined for years.

Hung the new light fixture in the Office/Spare Bedroom today. Love it ❤️❤️See the before and after.
11/28/2020

Hung the new light fixture in the Office/Spare Bedroom today. Love it ❤️❤️
See the before and after.

Framed the window in the office/spare bedroom today. Now all it needs is paint, caulking and blinds hung.
07/12/2020

Framed the window in the office/spare bedroom today. Now all it needs is paint, caulking and blinds hung.

Our weekend project. 1. Remove spare bedroom/office closet, master bedroom closet and the hall linen closet. 2. Reframe,...
07/03/2020

Our weekend project.

1. Remove spare bedroom/office closet, master bedroom closet and the hall linen closet.
2. Reframe, add insulation and hang drywall.

Hall drywall is painted and door hung for the Office/Spare Bedroom. I can’t wait till all the doors are changed out. l a...
06/11/2020

Hall drywall is painted and door hung for the Office/Spare Bedroom. I can’t wait till all the doors are changed out.

l am still mudding and getting ready to paint the room, pictures will be added soon.

I definitely need some color!! Any ideas on a neutral one I can use in the hall maybe on the walls in the Kitchen. My ca...
06/04/2020

I definitely need some color!! Any ideas on a neutral one I can use in the hall maybe on the walls in the Kitchen. My cabinets and Walls are White and I will be installing a White Backsplash. My countertops are White with splashes of Grey and Black. I like these colors in the picture below. Post pictures and suggestions below please!!

Drywall on the left side of the hall is hung, mudded, prepped for painting. I forgot to take pics before I started paint...
06/04/2020

Drywall on the left side of the hall is hung, mudded, prepped for painting. I forgot to take pics before I started painting but, you all get the idea.
Door will be installed soon ❤️

Coffee Bar wall is painted and ready for the cabinets to be put back and installed. Another task down and ???’s to go lo...
05/30/2020

Coffee Bar wall is painted and ready for the cabinets to be put back and installed. Another task down and ???’s to go lol 😆.

The spare bedroom/office has new walls studded in, electrical outlets replaced and is ready for drywall and the new door...
05/30/2020

The spare bedroom/office has new walls studded in, electrical outlets replaced and is ready for drywall and the new door hung!!

Kitchen Drywall hung and mudded. We also tore out the spare bedroom/office drywall in the hallway to restud, add soundpr...
05/03/2020

Kitchen Drywall hung and mudded.

We also tore out the spare bedroom/office drywall in the hallway to restud, add soundproof insulation and move the door opening (Hoping for a Barn Door🤞🏻🤞🏻)

I would like to add a sleeper sofa for guests not a bed and to do that the opening needs to line up with the utility room for easy moving.

We are getting there slowly but surely ❤️.

Cutting drywall today!!
04/20/2020

Cutting drywall today!!

Additional studs added, electrical outlets replaced and moved, light outlets replaced. Next steps:Hang drywall, mud and ...
04/19/2020

Additional studs added, electrical outlets replaced and moved, light outlets replaced.

Next steps:
Hang drywall, mud and paint
Install Cabinets back to floor
Install Live Edge wood shelves

It’s getting there slowly but surely. Mark has been down in the back so we are taking our time.

Address

Crothersville, IN
47229

Telephone

+18125211179

Website

Alerts

Be the first to know and let us send you an email when Creations From The Heart Renovations posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share