10/05/2026
Prepping for deck footings and regrading from construction. Moved approx 80 yards of material around the the site to make under the deck have a consistent grade. Excavated down to hard material to build off of of for the footings. Widened out the slope for long term structural integrity. Wetted down and compacted material that was moved.