Youngs Kitchen and Bath

Youngs Kitchen and Bath Home remodel / Handyman Exceptional service with exceptional prices, can't top that! Richard 720.495.2053

Have a great day and thank you for your consideration

I have more than 18 years experience in kitchen and bath remodel, as well as Handyman services. Any of your home repair needs are guaranteed with me!

*Full Kitchen and Bath Remodel

*Pluming (Faucets, Toilets, water heaters, Dishwashers, Sinks, tubs, copper, pex, drains, swamp cooler services, sprinkler system services, )

*Electrical (Light fixtures, ceiling fans, new wiring, wiring repairs)

*T

ile (new & repairs)

*Flooring ( tile, linoleum, and much more)

*Drywall (new and repair)

and many more handyman services

No jobs to big or small, just give me a call!

06/25/2024

July 20th

06/25/2024
Fourth day after surgery lots of pain. This is my upper arm swollen bruise. Probably the same way underneath the cast an...
07/31/2016

Fourth day after surgery lots of pain. This is my upper arm swollen bruise. Probably the same way underneath the cast and bandage. Be 2 months to 3 months before back to work thank you everybody for the prayers and best wishes and all the help.

07/21/2016

Was back to work up and going. It was great. Had a torn ligament in my elbow should have been more careful . Now I tore some nerves in my arm moving some flagstone for a sidewalk. Went to the doctors having surgery on the 26th will be out a minimum of 3 months

Knee healing up well starting to see therapist should be back to work within 2 weeks. Thank you for all the best wishes ...
06/02/2016

Knee healing up well starting to see therapist should be back to work within 2 weeks. Thank you for all the best wishes wishes can't wait to get back to work see you all soon

Another remodel job that I finished up. Before my surgery. bathroom shower pan floor fixtures total bathroom wall tile. ...
06/02/2016

Another remodel job that I finished up. Before my surgery. bathroom shower pan floor fixtures total bathroom wall tile. Kitchenette finish with washer and dryer. Sad to say first customer in my whole life that I have to take to court for non finish on payment. This customer said that the ice maker was hooked up on refrigerator which in the pictures you can actually see it was not. And now the ice maker was not working period was willing to try to help fix it then she was really rude and did not pay me so we'll be going to court. Job turned out really nice I did so many extras for the lady I thought she was a decent person but also some people have no respect

Before and after pictures of a bathroom remodel floor installed whirlpool bath tub before my surgery.
06/02/2016

Before and after pictures of a bathroom remodel floor installed whirlpool bath tub before my surgery.

Lot of pain today but I can move it. Hoping for a speedy recovery to get back to work to all my loyal customers. See you...
05/19/2016

Lot of pain today but I can move it. Hoping for a speedy recovery to get back to work to all my loyal customers. See you soon

05/17/2016

Hope to be back to work in three weeks. Thanks for all the prayers

05/13/2016

Another surgery hopefully this will be the last one on my knee. Will be back within 2 weeks hopefully no more than three thank you for all my loyal customers see you soon. God bless you all

Address

Denver, CO

Website

Alerts

Be the first to know and let us send you an email when Youngs Kitchen and Bath posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Youngs Kitchen and Bath:

Share