GT Architecture

Call Directions Website

GT Architecture Commercial, Education, Residential, and Industrial Architecture services.

We’ll be closed on Thanksgiving Day, Thursday, Nov. 26 and Friday, Nov. 27, so our team can spend time with family. We a...
11/23/2026

We’ll be closed on Thanksgiving Day, Thursday, Nov. 26 and Friday, Nov. 27, so our team can spend time with family. We are wishing you a warm and happy Thanksgiving!🍂 🍗🍁

The expansion project for the Dickinson Museum Center was just featured in Lab Design News!Designing a paleontology lab ...
11/18/2026

The expansion project for the Dickinson Museum Center was just featured in Lab Design News!

Designing a paleontology lab isn't just about square footage—it's about complex spatial problem-solving. The new facility has to handle the brutal physical realities of fossil prep (think heavy plaster jackets, specialized pneumatics, and major dust mitigation) while entirely rethinking how specimens move safely from storage to laboratory to the public eye.

Shoutout to our incredible project partners JE Dunn, Prairie Engineering, and Advanced Mechanical.

Check out the article to read more 📰




Dickinson Museum Center Je Dunn Construction Prairie Engineering, P.C. Advanced Mechanical Inc.

The Badlands Dinosaur Museum in Dickinson, North Dakota, is adding 12,000 square feet to improve fossil preparation, collections storage, specimen handling, and research. The $6 million expansion includes a larger laboratory, specialized safety equipment, and improved accessibility.

From all of us at GT Architecture, thank you Veterans for your courage, sacrifice, and dedication to protecting our comm...
11/11/2026

From all of us at GT Architecture, thank you Veterans for your courage, sacrifice, and dedication to protecting our communities and country.


End of an era on the Missouri River. 🌉For nearly 144 years, the old Bismarck–Mandan railroad bridge has defined the loca...
10/28/2026

End of an era on the Missouri River. 🌉

For nearly 144 years, the old Bismarck–Mandan railroad bridge has defined the local horizon. While progress moves forward with the new span, it’s hard not to look back at the craftsmanship and grit that went into the original 1883 iron and stone.
Did you watch the trains cross the old line? It will be sad not to see this iconic bridge anymore.

A 140-year-old railroad bridge is being dismantled piece by piece over the Missouri River.

The historic Bismarck–Mandan Rail Bridge in North Dakota dates back to 1883. Built for the Northern Pacific Railway, it helped complete a major transcontinental railroad connection and became one of the region's most recognizable landmarks.

After trains began using its replacement on September 16, 2026, crews started cutting the old steel trusses into sections and removing them with cranes. Temporary supports hold the structure during dismantling, while crews race to remove key sections before winter ice arrives.

The bridge's original steel spans were replaced in 1905, but its historic granite piers remained. Local preservation advocates spent years fighting to convert the crossing into a pedestrian and bicycle bridge instead of demolishing it.

Now, after more than 140 years, this piece of railroad history is disappearing from the North Dakota skyline.

Beautiful day to look at some roofs ☀️
10/14/2026

Beautiful day to look at some roofs ☀️

Cookies for the team today 😊🍪 Support a great cause, Dickinson Pink Ladies Darts, helping families that are battling can...
10/13/2026

Cookies for the team today 😊🍪 Support a great cause, Dickinson Pink Ladies Darts, helping families that are battling cancer at Baranko Bakery.

10/12/2026
Happy World Architecture Day! Today we celebrate the visionaries who turn abstract ideas into the physical spaces where ...
10/05/2026

Happy World Architecture Day! Today we celebrate the visionaries who turn abstract ideas into the physical spaces where our lives unfold. Architecture is more than steel, stone, and glass—it is a blend of art, engineering, and human culture that shapes how we live, work, and connect. To all the designers and architects building a more sustainable and resilient future: thank you for shaping our world.

In case you aren't familiar with our whole team. 😊 🧑‍💼Learn more about each of them on our website along with some of ou...
09/18/2026

In case you aren't familiar with our whole team. 😊 🧑‍💼

Learn more about each of them on our website along with some of our projects.

https://www.gtarchitecture.com/our-team

Twenty-five years later, we pause to remember the victims and heroes of September 11. As designers and builders, our wor...
09/11/2026

Twenty-five years later, we pause to remember the victims and heroes of September 11. As designers and builders, our work is a reminder of why safe, welcoming, and resilient spaces matter so much to our communities. We will never forget.

Address

401 W Villard Street
Dickinson, ND
58601

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+17014838434

Alerts

Be the first to know and let us send you an email when GT Architecture posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share