02/02/2025
•Our team recently completed a project that involved installing 16 sq of GAF Timberline HDZ Mission Brown shingles and upgrading the attic ventilation system.
•Intake vents were installed at the eaves, while exhaust vents were placed at the ridge to facilitate convection and circulate warm air through the attic space.
•The scope of the project included 90’ of edge vent (intake) and 45’ of ridge vent (exhaust), as well as the upgrade of gutters with new 6k seamless gutters and 3x4 downspouts.
Give us a call and get your roof inspected (484)630-7320 .