WD Builders Inc

WD Builders Inc Dormers & Additions

03/28/2026

Concrete pour complete 🚧🔥
The foundation is officially set, and this project is moving full speed ahead 🏡💪

This is one of the most important phases of the build—everything starts here. Solid work, clean finish, and ready for what’s next.

Stay tuned as we continue bringing this extension to life 👷‍♂️✨

03/27/2026

Concrete pour day 🚧🔥
We’re officially moving forward with this home extension—foundation work in progress and bringing this project one step closer to reality 🏡💪

From prep to pour, every detail matters. This is where the structure begins and the vision starts taking shape.

03/27/2026

🚧 Project Update 🚧

We’re kicking off a major home addition—adding over 1,000 sq ft of living space 🏠✨

The existing garage is being removed to make way for a larger footprint, and we’re building new living space above 🔨⬆️

This is just the beginning… stay tuned as this transformation comes to life 👀🔥

➡️

03/25/2026

Big progress on this home extension 🏡✨
We’re adding 1,000 sq ft of living space, foundation is underway, and interior demolition is in full swing. Step by step bringing this vision to life 🔨💪

11/26/2025

🏗️✨ 203k Loan Project Update!
This is basically a new construction full renovation from top to bottom!
Client extended the 1st & 2nd floor, new plumbing, electric, HVAC 🔧⚡❄️
Demolition ✔️
Exterior ✔️
Now we’re heading inside to bring this home to life! 🏡💫

11/26/2025

🔥 Fire claim project update!
Roof ✔️
Now moving on to the siding 👷🏽‍♂️✨
Client chose a gorgeous Ironstone vinyl siding with white window framing + trims — this house is about to pop! 🏡🤩

11/21/2025

🔥 Interior Update – Fire Claim Project 🔧
• 🧱 Interior walls were removed to create an open-concept kitchen and improve overall flow.
• 🪚 A flushed, upgraded header beam was installed to support the new layout.
• 🏗️ The new structural beam is built with two (2) LVL beams + a 1-inch metal plate for added reinforcement and stability.

11/21/2025

🔥 Property Update – Fire Claim 🔧

The restoration work is moving along smoothly:

🪟 Windows: All new windows have been installed.
🏠 Roof: Roofing is currently in progress.
🧱 Siding: Siding installation will be the next phase once the roof is complete.

I’ll continue to share updates as the project moves forward. ✨

11/13/2025

UPDATE from fire damage to a fresh start 🔥 Demolition ✅ Lumber delivered ✅ Plywood going up 🔨 Rebuilding stronger every step of the way.

11/12/2025

Project UPDATE on our fire claim restoration — exterior demolition is now underway. Our team is carefully removing all damaged framing and preparing the structure for the rebuild phase. Step by step, we’re transforming this fire-damaged property back into a safe, beautiful home.

08/11/2025

From bare ground to a brand-new vision! 🏡✨
Foundation ✔️ Demolition ✔️ Now framing is in full swing, and this home’s transformation is just getting started. Watch this space—big things are coming! 🚀

Address

1840 Hempstead Tpke
East Meadow, NY

Alerts

Be the first to know and let us send you an email when WD Builders Inc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to WD Builders Inc:

Share