08/15/2024
The electrical work got finished up last week at the basement remodel job. So this week I've been back there insulating and hanging drywall. Hoping by beginning of next week I'll be mudding everything. So hopefully by the end of that week I'll be installing the flooring and trim. Yes I know it looks like a mess down there but theres alot of stuff that was lefted down there so having to work around that or move it. So it looks a little messy at the moment.