04/07/2026
Basement bathroom renovation: The bathroom was restored after a water flow leak caused significant damage, necessitating a full demolition of the bath and carpet in the basement main area. Subsequently, a new shower base was framed, and plumbing was completed. Drywall installation was followed by the application of cement boards on the shower walls. New tile was then installed on the main bathroom floor, shower floor, and walls. A new vanity was put in place, and the renovation was finalized with the installation of an angled shower door, new LVP flooring installed, resulting in a stunning completion.