07/23/2025
This one is about wrapped up. Tiling the top and bottom of the floating shelves. The niche is mint! After finishing the niche, I will be tiling the top of the curb then grout, 100% color match silicone caulk for all change of planes (corners); install the trim out for shower valve, handheld, and shower head, then finally the shower door will be reinstalled. This was a Demo and reinstallation due to poor quality. The bottom of the shower was improperly installed, it leaked and caused significant water damage, as well as high and low tile everywhere. Glad I could come in and install a quality shower that will last years to come. Im working my way down my list of jobs sold, and I am almost caught up. I appreciate everyone's patience. I do not sacrifice quality for time. If I rush, mistakes are made, and the job will take longer. I have been grinding the last 6 months. Finally I see an end in sight.