1 Stop Home Solutions, LLC

1 Stop Home Solutions, LLC Helping our neighbors achieve their dream homes, one project at a time.

08/20/2026

We are ramping up our Govee light season with our custom made 3-D brackets being printed tirelessly!
We use the brackets to secure each individual lightbulb into place with screws for a true permanent installation.
As the ORIGINAL Govee installers in the DFW area with over 400 verified installs, you can rest assured that your home will look great for years to come!

Always free estimates and up front pricing of $6/ft all year round. (Light system not included)
We don’t raise prices for the holiday season!

08/19/2026

Popcorn popcorn popcorn 🍿 go away!!!
More progress updates on our Cascade project. We’ve officially started the second phase which is all of the first floor. Removing popcorn throughout floor. Then repair drywall with tape and mud, then texture it all up.
Much work to do, catch you on the flip side 🏃‍♂️ 🔨

Like our post and follow our page to see all the updates!

Popcorn popcorn popcorn 🍿 go away!!!More progress updates on our Cascade project. We’ve officially started the second ph...
08/19/2026

Popcorn popcorn popcorn 🍿 go away!!!
More progress updates on our Cascade project. We’ve officially started the second phase which is all of the first floor. Removing popcorn throughout floor. Then repair drywall with tape and mud, then texture it all up.
Much work to do, catch you on the flip side 🏃‍♂️ 🔨

Like our post and follow our page to see all the updates!

08/18/2026

Current progress in the “Cascade” project!
- Build back is starting in the master bath after extensive demo and repairs.
- all bedrooms had popcorn ceiling removed, new texture applied, walls patched up
- paint has been completed in ceilings, walls, trim and doors
- new baseboards have been installed and painted.

Up for today!
- Tile installation in master bath will start
- carpet in 3 out of 4 bedrooms will be installed
- furniture will have to be moved into new carpet bedrooms to make space to work in the other rooms

So much to do but it’s taking shape!
Stay tuned by liking our post and following our page 😉

Current progress in the “Cascade” project!- Build back is starting in the master bath after extensive demo and repairs. ...
08/18/2026

Current progress in the “Cascade” project!
- Build back is starting in the master bath after extensive demo and repairs.
- all bedrooms had popcorn ceiling removed, new texture applied, walls patched up
- paint has been completed in ceilings, walls, trim and doors
- new baseboards have been installed and painted.

Up for today!
- Tile installation in master bath will start
- carpet in 3 out of 4 bedrooms will be installed
- furniture will have to be moved into new carpet bedrooms to make space to work in the other rooms

So much to do but it’s taking shape!
Stay tuned by liking our post and following our page 😉

Probably my most favorite job. To be installing the paver bricks at American Airlines Museum. It’s not much, but just ma...
08/15/2026

Probably my most favorite job. To be installing the paver bricks at American Airlines Museum. It’s not much, but just makes me think I’m a small part of their history. 😊

08/12/2026

Back to the basics.
- Foundation corner pop repaired this morning. ✅
- Parquet wood floor removed in two bedrooms to make way for new carpet install. ✅
- fence line and new gate put up. Pre-stained cedar wood. ✅

Back to the basics. - Foundation corner pop repaired this morning. ✅ - Parquet wood floor removed in two bedrooms to mak...
08/12/2026

Back to the basics.
- Foundation corner pop repaired this morning. ✅
- Parquet wood floor removed in two bedrooms to make way for new carpet install. ✅
- fence line and new gate put up. Pre-stained cedar wood. ✅

08/11/2026

We painted their whole house on the inside, so now it was time to paint their whole house on the outside!!
Done in a day and a half while also replacing trim and fascia boards as needed.

For all your painting needs, contact the experts at 817-995-3827

08/07/2026

And so we embark on another total house renovation!
First phase is the second floor.
Gutting the master bathroom and removing popcorn ceiling in master bedroom and 3 additional bedrooms.
Today we got done with demo in bathroom and master bedroom.
Next week we’ll hit it hard and get the popcorn ceiling removed on entire second floor. Start build back in master bath, and texture ceilings.
Stay tuned as this house gets the 1 Stop Home Solutions treatment 🤩

Address

Fort Worth, TX

Alerts

Be the first to know and let us send you an email when 1 Stop Home Solutions, LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to 1 Stop Home Solutions, LLC:

Shortcuts

Share