DB Construction

DB Construction Fountain based construction company with nearly 40 years in general construction. We are happy to help with any and all repairs or remodeling needs.

We are well versed in all aspects of home repairs and remodeling as well as building codes.

Here we go again. I love my old trucks but sometimes its a little rough keeping them on the road. CV axle today; not a d...
07/24/2026

Here we go again. I love my old trucks but sometimes its a little rough keeping them on the road. CV axle today; not a difficult job but the timing is terrible. Lol. Hope everybody else is having a terrific day

Friday we completed this little tile accent around a window. Today the stucco was finished around the window and the til...
07/18/2026

Friday we completed this little tile accent around a window. Today the stucco was finished around the window and the tile. Pics to follow. Homeowner chose the tile and the design. I like it. What do you think?

Fixed this up yesterday.
05/27/2026

Fixed this up yesterday.

Before and after of a backyard cleanup. We removed an old playhouse, removed timbers around an area with deep deep pea g...
05/06/2026

Before and after of a backyard cleanup. We removed an old playhouse, removed timbers around an area with deep deep pea gravel, removed a concrete slab that once help a small shed, removed all of the pea gravel and filled in the area with dirt. The pea gravel will get repurposed and all of the trash was hauled off to the dump. We had to add roughly 13 tons of dirt to fill in the area. It will all settle and could probably use some more in the future.

These are some photos of work completed by Wirenut and prime examples of why not to hire them. That is a load bearing st...
05/06/2026

These are some photos of work completed by Wirenut and prime examples of why not to hire them. That is a load bearing stud that is completely cut through and you can see daylight outside. All of that stucco was broken out for no reason and not repaired. Bare wires inside the wall where they used a waterproof conduit that was way too short. The last pic is the drywall put back on the wall; kinda. The huge disconnect on the exterior wall is way overkill, although an exterior disconnect is needed this is a very expensive way to go about it and the interior panel is installed incredibly high. These companies are commissioned based and techs are most often not licensed. Im guessing they sold this job for around $7500.00 when realistically it could have been completed more efficiently for around $3000.00.

Sprikler backflow valve replacement. Did not have the water ahut off and drained before winter. Froze and broke
05/06/2026

Sprikler backflow valve replacement. Did not have the water ahut off and drained before winter. Froze and broke

Stair handrail came out great!
04/13/2026

Stair handrail came out great!

Before and after pics of a hole in the wall where a swamp cooler was removed. A stud was cut for cooler installation. We...
04/13/2026

Before and after pics of a hole in the wall where a swamp cooler was removed. A stud was cut for cooler installation. We had ro remove the drywall and reframe this wall correctly to install the window. A little trim and paint and its complete.

Address

Comanche Village Drive
Fountain, CO
80817

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+17199606078

Website

Alerts

Be the first to know and let us send you an email when DB Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to DB Construction:

Shortcuts

Share