Was able to finish the flooring job yesterday, minus reinstalling the wood stove in the sunroom Did mulching today
04/28/2026

Was able to finish the flooring job yesterday, minus reinstalling the wood stove in the sunroom

Did mulching today

We were able to get flooring in the master bedroom and part of the master bathroom yesterday. Room put back together and...
04/19/2026

We were able to get flooring in the master bedroom and part of the master bathroom yesterday.

Room put back together and trim re-installed.

Got the last of the floor jacks in at 730 this morning. Thanks to Denos Home Center for the lumber, jacks and delivery!!...
04/17/2026

Got the last of the floor jacks in at 730 this morning.

Thanks to Denos Home Center for the lumber, jacks and delivery!!!

Took a small break to do an emergency floor repair. Side building 19ftx16ft with busted floor joists Had to jack up and ...
04/14/2026

Took a small break to do an emergency floor repair.

Side building 19ftx16ft with busted floor joists

Had to jack up and install new floor joist w re-enforced basement jacks

Got spare bedroom done last week.
04/14/2026

Got spare bedroom done last week.

Day 3 on flooring project. A bit slower finishing sitting room and going down a hallway to laundry room/full bathroom.Ha...
04/03/2026

Day 3 on flooring project. A bit slower finishing sitting room and going down a hallway to laundry room/full bathroom.

Had to tear up 2nd layer of old flooring so it’s a smooth walkway no bumpy transition.

Laundry/bathroom flooring done, resetting toilet and trim next week. ( house has two full bathrooms)

Day 2 on our new 1400 square feet flooring project.
03/31/2026

Day 2 on our new 1400 square feet flooring project.

Finished the bathroom remodel, it turned out awesome!!!Next is a 1400 sq ft flooring project
03/26/2026

Finished the bathroom remodel, it turned out awesome!!!

Next is a 1400 sq ft flooring project

03/21/2026
While on pause from our current bathroom project, we slipped in a 3 window replacement job today.Replaced 3 old windows ...
03/21/2026

While on pause from our current bathroom project, we slipped in a 3 window replacement job today.

Replaced 3 old windows w new construction windows. Removed siding and installed seal tape over the nail flanges for wind and water resistance.

Foamed and caulked the interior for warmer feeling.

One section was found that the original builders did not put house wrap on which caused the window to leak

We were able to reuse the original inside trim after we spray foamed and caulked them.

Tile floor installed plus the shower fixtures and toilet for convenience use.Drywaller is working on it now
03/20/2026

Tile floor installed plus the shower fixtures and toilet for convenience use.

Drywaller is working on it now

Not very exciting today, but we upgraded plumbing and drains in the crawlspace w service shut off vales to the bathroom ...
03/07/2026

Not very exciting today, but we upgraded plumbing and drains in the crawlspace w service shut off vales to the bathroom and kitchen . (On day 3 of remodel )

Finished the shower walls and drywall in the bathroom.

Next is Tom Anderson to finish the drywall, an tile flooring Wednesday.

Our other jobs are Monday n Tuesday.

Address

908 E 5th Street
Fowler, IN
47944

Telephone

+17654260527

Website

Alerts

Be the first to know and let us send you an email when Blue Line Construction Llc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Blue Line Construction Llc:

Share