03/31/2026
Another day another boiler. This time we did a couple progress pictures from start to finish. Step one (8am) hang the boiler board and boiler. Step two is connect the infloor piping and label. Step three is match the wires to the pumps and thermostats. Step 4 make the rest of the connections and load the truck and be home by 8 pm. This boiler has six infloor heat zones with an indirect domestic water tank.