04/30/2026
💪 The hardest working crew in the industry wrapping up a BIG parking garage on campus. This 6- story monster boasts 5 stairwells, an elevator, and handrails for dayssss 😂
The stairwells were thoroughly power washed and all walls/handrails were scraped and sanded. We covered all windows and floors to prevent overspray, then applied some fresh paint to the walls and made those handrails all black. Even the elevator doors got a facelift! Just in time for graduation 🎉
Check out these before and after photos 🤩