02/18/2026
This is a long overdue post, but here is one of the jobs that has kept us busy during the summer of 2025 into 2026! We started this 50x104x18 shouse in July. Mother nature produced heavy rain fail which made jobsite conditions challenging, however we are now to the finishing touches on the interior! We have built the shell, finished shop interior, framed all interior walls, insulated living quarters after spray foam, hung sheetrock, and we are now hanging cabinets and interior doors. We'll also be trimming windows/doors, installing hand railings, and installing bathroom vanities. More pictures of this project will be posted close to or after completion! Enjoy the photo dump of this project!