06/11/2026
Regrade the yard to prep for the new deck. Dug and poured in 36” deep footers. Cut in new drain tiles under the deck to collect any water run off. Trenched in a conduit for future electrical. Added w**d barrier and pea gravel the deck. Framed the joist at 12” O.C. with joist hangers. Installed the new composite deck with a picture frame boarder. Then added in the “half wall/hand rail” to close in the steps. Finished with a little more dirt work to get a final grade and added seed and straw.