06/17/2026
Phase 1 Done! 🧱🦾
Starting from the ground up at our project.
Heavy grading, gravel sub-base, and structural rebar tied strictly to spec.
The concrete footing is poured and rock solid.
Next up: Formwork for the 12-inch poured concrete walls.
Stay tuned! 📐🔥