06/17/2026
This project involved a bit everything; restoration and repair, installing additions, and general TLC. We power washed, and stripped the deck. Then we added the woodwork necessary to secure the pipe railing inserts, and hand railing structure. This was followed by sealing a few openings where deck meets house. To finish, we painted the steel pipes black using Rust-Oleum Solid Paint, and stained the deck using Australian Timber Oil in Jarrah Brown. The results are sharp!
FREE ESTIMATES
BUILD | ENHANCE | RESTORE
Got a need? Give us a call. ๐
http://EverybodysFavoriteDeckGuy.com
(317) 371-3724