Full bathroom remodel that required tearing out all the drywall, tile flooring, breaking up a cast iron tub, tile that was on floated out concrete/mortar, as well as a adjacent vanity area in the bedroom outside the bathroom. Fun project that a million tile leveling clips and alot of home owners patience later turned out looking good. I typically do not like longer projects since they tend to wear on a clients patience even when things do not go off the rails, but I was able to get the project done for cheaper than anyone else would have quoted and they are happy with the finished bathroom and vanity area.