11/14/2024
I would like to thank my client in Hop Bottom PA for the opportunity to complete this project. This was started in June and took a massive amount of blood, sweat, and tears to complete. I would like to thank everyone who had a hand in this project. The entire house was stripped down to wood, loose boards tightened and rotten boards replaced, a coat of oil primer then 2 coats of latex on everything. The wrap around porch ceiling was brought down to bare wood then stained and poly finish. The wrap around floor was stripped to wood, fixed and enameled. The back porch ceiling was removed, replaced then stained and poly. All new trim around the ceilings. 19 windows were replaced then some additional trim was added inside and out then caulked and painted. Bilco door was removed, re framed, then primed and painted. Again, to the client, thank you for the opportunity and the patience throughout this entire process and project!