03/01/2026
In South Louisiana we get gorgeous weather basically year-round⦠so why wouldnāt you have a camp to actually enjoy it? āļøšæ
My clients are remodeling their camp and weāre keeping a lot of the original charm, just elevating it with layered wood stains, new textures, and intentional finishes that still feel collected over time. Camp vibes⦠but refined.
Construction doesnāt start until January 2027, but weāre in full prep mode right now. And let me tell you, this is where the magic (and the money saved) happens.
Cabinet schedule āļø
Window + door selections āļø
Paint palette āļø
Hardware āļø
Stone slabs āļø
New Floors āļø
When you walk into build day with every selection made and documented, your builder is happy, your timeline is smoother, and your budget stays tighter. No scrambling. No last-minute panic decisions.
Design isnāt just picking pretty things, itās planning smart so your vision actually gets built the right way.
If youāre thinking about remodeling a camp, lake house, or primary home in South Louisiana, or anywhere #.. start earlier than you think. Your future self will thank you.